4.2 Migration Approach

Official task mapping

SAP-C02 task 4.2: Transfer and identity knowledge; secure application, file and database migration selection. This lesson applies the official task to an original design exercise; it is not an exhaustive exam syllabus.

Prerequisites

Review DMS, Transform MGN and DataSync. Be able to explain the relevant failure boundary and access/cost model before choosing a service.

Match the migration unit

Use AWS Transform MGN (the mgn API namespace remains) for supported server replication/test/cutover workflows. Staging, tests and target resources have infrastructure charges. Finalizing cutover does not itself shut down the source operating system; source-write fencing and decommissioning remain explicit runbook actions.

DMS moves supported data using full-load/CDC modes and source-specific prerequisites. Schema conversion is a separate capability/tooling decision: unsupported procedures, permissions, indexes and application SQL need assessment and manual remediation. CDC reduces downtime but does not guarantee zero lag or migrate every database object.

DataSync handles supported file/object transfer paths; validate agent/mode requirements, metadata preservation, verification and network access. Transfer Family serves supported transfer protocols, not block replication. Compare usable throughput, data change rate and deadlines; network transfer time is not just advertised link speed.

SMS is retired. Snowball Edge and Snowmobile are also in full shutdown; historical Snow Family exam mentions are not current deployment recommendations. Check current service/customer availability rather than copying device capacities from old tables.

Transfer mechanism and cutover matrix

UnitCandidatePreconditions
Supported server disksTransform MGNAgent/connectivity, staging, test and target support
Database records/CDCDMSSource logs/permissions, target schema and compatibility
Schema/stored codeSupported conversion assessment/toolingManual remediation and application regression tests
Files/objectsDataSyncSupported locations/mode, metadata and verification
Client SFTP/FTPS/FTP/AS2 workflowsTransfer FamilySupported protocol, identity, storage and integrations

A network path with 500 Mbit/s usable bandwidth transfers at 62.5 MB/s before protocol/application effects. At 20 decimal TB it needs about 3.7 days for one full copy; a 10% usable duty cycle increases this to about 37 days. Add source changes and validation, not merely link speed. DataSync is not guaranteed faster than every rsync/CLI workload.

Distinguish full load, ongoing CDC and schema conversion. Build indexes/constraints/permissions as required by the chosen source/target and tooling; neither DMS nor SCT guarantees all objects convert. Plan LOBs, transaction ordering, source log retention and validation.

Offline-device tables are historical when the offering is retired/restricted. An insufficient pipe still needs a transfer alternative, but “choose Snowmobile” is not a current answer. Assess supported provider/partner transfer paths or a different deadline/connectivity plan.

A complete cutover stage gates writes, confirms replication catch-up, reconciles counts/business invariants, redirects clients, observes and then finalizes/decommissions only after authorization.

Scenario and rationale

A 20-TB file share and a changing PostgreSQL database must move over a 500-Mbit/s usable path. At a decimal 20 TB, ideal transfer alone is about 320,000 seconds, or 3.7 days; protocol overhead and ongoing changes increase this. Evaluate DataSync for files and DMS full load/CDC for supported database data, with separate schema/permission conversion and cutover checks.

Reject one file-copy tool for a live database without consistency controls. Reject “CDC means no downtime”: write freeze, catch-up, validation and application switching still take time.

Practice drill

Create a cutover checklist covering prechecks, network/IAM/key access, initial copy, deltas, source-write freeze, validation, target enablement and rollback. Specify measured lag and reconciliation thresholds. Include the point after which rollback needs reverse synchronization. Do not finalize or delete a source in this design exercise.

References

Return to Domain 4. The drill is proposed study work, not a claim of a completed deployment.